Welcome to the official website of ZHUHAI KAMEDA TECHNOLOGY CO., LTD.
Kameda Technology
ONE-STOP PCBA & EMS MANUFACTURING
Sales Hotline +86 756 516 6177

Quality Control

QUALITY CONTROL

Quality Control

You are here: Home > Quality Control

Quality is built at each operation, not sorted out at final inspection. There are check points at printing, placement, reflow, through-hole and hand soldering, and assembly, backed by AOI, X-ray, ICT, flying probe, FCT and visual inspection. When a check fails, the line stops and the cause is found before the next board is built, so the defect does not travel downstream.

Inspection and test

  • AOI. Two stations, one before reflow and one after. Pre-reflow AOI finds wrong part, missing part, offset and reversed polarity at the point where rework is only a re-place, which is the cheapest moment to fix any of them. Post-reflow AOI finds tombstoning, bridging, insufficient solder, solder balls and poorly formed joints. It is fast enough to run on every board, so it is the first line of screening in volume production.
  • X-ray. The only way to see joints under BGA, QFN and LGA packages, where neither the eye nor AOI reaches. It shows voiding, bridging, open joints and package offset. We X-ray the first article on every new build, sample at an agreed rate in production, and always re-inspect after BGA rework. Worth its cost on any board with area-array packages, and largely unnecessary on a simple two-sided board with no hidden joints.
  • ICT. A bed-of-nails fixture contacts test points across the board and measures resistors, capacitors, diodes and transistors node by node, catching opens, shorts, wrong values, reversed parts and out-of-tolerance components. The fixture is a one-time cost and takes time to build, but the test cycle is seconds. It pays for itself on a stable design running in volume, and it needs test points designed in, which is a DFT question best settled before layout is released.
  • Flying probe. Probes travel to coordinates taken from the CAD data, so no fixture is needed and a design revision means only a program change. Coverage of opens and shorts is thorough, but it tests one net at a time and is slow per board. That makes it the right tool for prototypes, small runs and verification before a design is committed to an ICT fixture.
  • FCT. The board is powered up on a test fixture and exercised with a test program, either supplied by you or developed here to your test specification. It simulates real operating conditions and verifies board-level function and key parameters. FCT catches what electrical testing cannot: firmware behaviour, interface function, calibration values and anything that only appears when the board is running. It is normally placed before final assembly or before shipment.
  • Visual inspection. Used at the operations that are still manual: through-hole insertion, hand soldering, coating and assembly. Operators work under magnification against your golden sample and limit samples, checking joint appearance, component orientation, markings, contamination and cosmetic damage. Trained and vision-checked before they are assigned to the station. Judgement calls on cosmetics are settled by limit sample, not by opinion.

Process control

Incoming inspection (IQC) checks part number, specification, quantity, packaging, moisture sensitivity level and physical condition on every delivery. Critical and high-value components are sampled and verified electrically. Material that fails is rejected. If a deviation has to be accepted to keep a build moving, it goes back to you or to engineering for written approval before it is issued to the line.

First article inspection (FAI) is run at every line start, changeover, reel change and program change. Process and quality both check the board against the BOM, the placement drawing and the approved sample, and both sign it off before the line runs. In-process inspection (IPQC) patrols on a fixed interval and records print thickness, reflow profile status, nozzle and fixture condition, and soldering and coating parameters. Outgoing inspection (OQC) samples each batch for appearance, function and packing.

Traceability

Each work order carries one batch number and states your part number, model, revision, build date and quantity. Material is kitted against the BOM before it is issued, and the manufacturer, date code and lot number of each part are logged against the feeder position it was loaded into. Printing, placement, reflow and test parameters, plus the inspection records, are filed against the same work order. If a problem appears in the field months later, the batch number leads back to the exact component lots, operators and machine settings used, which keeps the containment to the boards actually affected instead of the whole shipment.

What is on record

Every build leaves a paper trail: SPI and AOI results, X-ray images from the first article and from production samples, ICT or flying probe logs, FCT logs, and the signed first article record. Which of those travel with the batch, in what format and at what sampling rate, is agreed job by job before the first board is built, because a ten-piece prototype run and a repeat production order do not need the same paperwork. Ask for the list you want at quotation stage and it goes into the work instruction with everything else.

Workmanship standard

Boards are built and inspected to the acceptance class you specify, most commonly IPC-A-610 Class 2 or Class 3. Before the job is released, engineering confirms the drawings, the golden sample and the limit samples, and writes the accept and reject criteria into the work instruction and the inspection specification. Solder volume, fillet height, allowable offset and the accept/reject boundary are agreed in writing by both sides before production starts. Where you have your own internal workmanship standard, that standard governs.

AOI and visual inspection station
Inspection pointWhat it covers
IQC incoming inspectionPart number, specification, quantity, packaging, MSL and physical condition; critical components sampled and verified electrically
FAI first articleAt every line start, changeover, reel change and program change; signed off by process and quality before the line runs
Pre-reflow AOIWrong part, missing part, offset and reversed polarity, while rework is only a re-place
Post-reflow AOITombstoning, bridging, insufficient solder, solder balls and poorly formed joints
X-rayHidden joints under BGA, QFN and LGA: voiding, bridging and opens. First article always, production sampled, and after any BGA rework
Electrical testICT or flying probe for opens, shorts, wrong parts and out-of-tolerance values
FCT functional testBoard powered on a fixture and exercised under simulated operating conditions to verify function and key parameters
Burn-inPowered burn-in at the temperature, duration and load you specify, to bring out early-life failures
IPQC in-processPatrol checks on print thickness, reflow profile, fixture and nozzle condition and operator method, each one recorded
OQC outgoingBatch sampling of appearance, function and packing before the goods are released
RecordsAOI and X-ray images, ICT or flying probe logs, FCT logs and the signed first article record; which of them ship with the batch is agreed job by job
Acceptance standardThe class you specify, commonly IPC-A-610 Class 2 or Class 3

For a quotation, send us your Gerber, BOM and pick-and-place files — we reply within one working day.

Send an inquiry

Contact Us
Address: 4/F, Block 4, No.26 XinKe 2nd Rd, Baijiao Science & Technology Industrial Park, Doumen District, Zhuhai, Guangdong, China 519100
广东省珠海市斗门区白蕉镇新科二路26号(厂房四)4楼
Tel: +86 756 516 6177
Email: Show contact details
Business licence no.: 91440400MA521FNB07
Quick Links
Follow Us
WeChat

WeChat

Copyright © 2018-2026 ZHUHAI KAMEDA TECHNOLOGY CO., LTD. All Rights Reserved |Sitemap|Legal Notice|Privacy Policy
Contact
+86 756 516 6177